nope
CSSI In the Press Page Banner



Everything that you need to know about RVSM Monitoring

  1.  What is monitoring?
  2.  Is monitoring required?
  3.  When should I get my aircraft monitored?
  4.  How can I get my aircraft monitored?
  5.  Are ground-based monitoring systems available in North America?
  6.  How much does a GMU monitoring flight cost?
  7.  How do I schedule a GMU monitoring flight?
  8.  How much lead time do I need to schedule a monitoring flight?
  9.  How much time does it take to conduct a monitoring flight?
10.  Can I use the GMU to monitor my own aircraft?
11.  How do I buy or lease a GMU?
12.  How long will it take to get the results of my monitoring flight?



1 What is Monitoring?

Aircraft height-keeping performance monitoring is a quality check on the engineering work and approval process associated with the safety of RVSM operations.

Back to top

2 Is monitoring required?

Yes, all operators are required to participate in the regional monitoring program. This participation usually means an operator will need to monitor two (2) individual aircraft of each type that they operate.

Back to top

3 When should I get my aircraft monitored?

Monitoring can take place any time after the engineering upgrade work for RVSM compliance is completed. At this point, the aircraft will be airworthiness approved for RVSM.

Back to top

4 How can I get my aircraft monitored?

Aircraft can be monitored for RVSM by scheduling a GPS-based monitoring system flight or flying over a ground based monitoring system.

Back to top

5 Are ground-based monitoring systems available in North America?

Yes, the Federal Aviation Administration (FAA) and NAV CANADA have plans to deploy ground-based monitoring systems in the United States and Canada.

Back to top

6 How much does a GMU monitoring flight cost?

The cost of a GMU monitoring flight will vary depending on factors which include monitoring location and technician time. Generally, the cost for one aircraft is approximately $2,100 plus travel and per diem if travel to monitoring location is required.

Back to top

7 How do I schedule a GMU monitoring flight?

To schedule a GMU monitoring flight contact the CSSI RVSM Operations Coordinator at monitor@cssiinc.com or call 866 GMU-8111 or 202 554-1050.

Back to top

8 How much lead time do I need to schedule a monitoring flight?

Typically a monitoring flight can be scheduled with 3-5 business days of lead time.

Back to top

9 How much time does it take to conduct a monitoring flight?

A typical monitoring flight should take no more than two hours and consists of the following: the monitoring technician will temporarily install the GMU in your aircraft (this takes approximately 10 minutes); the technician needs to collect no less than 30 minutes of data at an RVSM altitude (FL290-410).

Back to top

10 Can I use the GMU to monitor my own aircraft?

Yes, for a fleet of 5 or more aircraft self-monitoring is generally available. Operator self-monitoring includes a training charge of approximately $1,595 and a processing charge of approximately $750 for each flight. What is required to conduct a GMU monitoring flight? The basic requirements to conduct a monitoring flight are:

1.  30 minutes of straight and level flight at FL290-410
2.  5-amp plug-in power (not lav/shaver outlet)
3.  Pre-flight access to cabin or cockpit windows to fix suction cup mounted GPS antennas
4.  limited access to flight crew by monitoring technician for transponder code changes and flight information


*this charge is only applicable to those operators who train at CSSI HQ…the training charge is more if we travel to their facility to conduct training (again not including travel)

Back to top

11 How do I buy or lease a GMU?

Only one GMU has ever been purchased by a commercial concern. All other GMUs are the property of the FAA. CSSI is a qualified and FAA-authorized provider of GMU services.

Back to top

12 How long will it take to get the results of my monitoring flight?

Monitoring results are typically completed within 10 business days of the monitoring flight. The data is initially processed by CSSI and then forwarded to the FAA’s Wm. J. Hughes Technical Center (WJHTC) for calculation of the aircraft’s altimetry system error (ASE) value. Upon completion of the results, the WJHTC will send your RVSM letter to your FSDO representative (this is contingent upon there being a record of your aircraft’s airworthiness approval in the FAA’s Program Tracking and Reporting System [PTRS]).

Back to top

 
  Copyright © 2006 CSSI, Inc.     

CSSI, Inc. RVSM
400 Virginia Avenue SW, Suite 210
Washington, DC 20024
866.GMU.8111 phone
202.554.1050 phone
202.863.2398 fax